Over the last few months I have been rowing my Acorn 15 regularly because I enjoy it and I need the exercise. My Acorn 15 rowing boat has a fixed rowing position and I decided that it would be a good idea to try rowing with a sliding seat to get a more complete workout. One option would have been to modify the Acorn 15 by fitting a sliding seat. I wasn't keen on doing this because I didn't want to spoil the look of the Acorn 15. It would also have been a compromise solution.
While these ideas were going round in my head I came across the photo below taken by my friend and fellow member of the Wooden Boat Association of Queensland Ian Primrose.
The photo is of a Classic Derwent Skiff designed by Allan Witt of a company called Row and Sail based in Tasmania.
I liked the appearance of this boat which is configured with a sliding seat as shown. The rowing position can be moved forward and an additional seat added for a passenger if desired.
This version of the Derwent Skiff is 5.5 metres (18 feet) long and should weigh around 38 kg. This is less than half the weight of my Acorn 15.
Wednesday, 7 March 2018
The Kit Arrives. Inner Stem, Keel and Outriggers
Inside the pack were four and a half sheets of 6mm ply. Each sheet had been CNC cut with the pieces held in the sheet with short tabs. Here are the four full sheets - you can enlarge the photos by double clicking on them.
First job was to laminate the 3 layers of 6mm ply that form the inner stem. Where the pieces join there is aan individual puzzle joint so the pieces can only be assembled in the correct order. Here they are wrapped around the mold with plastic to stop them sticking to the mold and plenty of clamps.
While the epoxy was setting on the stem I laminated the five pieces that make up one of the outrigger arms. There are 3 pieces of 6mm ply with outer layers of 4mm solid timber. The laminations are kept in place by the bolt at the left hand end of the jig. With this pulled tight the clamps are applied progressively to the right.
Here is the complete lamination held in a pipe clamp to stop (or reduce) springback until the epoxy is hard.
The rest of the keel is made up of 2 layers of 6mm ply put together in sections and glued with epoxy. No photo of that but essentially the same as the stem. Once the stem and keel are glued (and screwed to the mold) the edges have to be bevelled so the first plank can be glued to them. I did this with a Ryobi cordless planer fitted with an arm the outside of which is in line with the base of the plane.By running the arm along the lower stringer (where the plank will sit the plane is held at the correct angle for the bevel.
Here are the pair of outrigger arms after some initial cleanup. When in the boat the oarlocks will be in the hole at the rounded end, the far ends are joined together at the keel and the mid point is bolted to the gunwale.
Next step is to make the transom, fit it to the mold and glue it to the end of the inner keel. While that glue is setting the aft end of the garboard planks has to be prepared.
Wednesday, 14 February 2018
First Steps.
The building frame arrived superbly packed and was landed on my driveway - too heavy for 2 of us to carry.
I unpacked the parts and laid them out on the floor in my shed. It looks a bit like a 3D jigsaw puzzle. The parts are easily identified and the instructions on the assembly very clear.
The bow section is assembled and then fitted in place on the frame. The fit is very good a judicious use of a mallet was needed to get it snugged down. Screws are used through the bottom board to stop it moving about. The rest of the section frames are inserted and held firm by screws from underneath and the side.
Had to think a bit more about assembling these pieces at the transom but here it is from the side and behind.
Seven stringers have still to be fitted, three on either side and one along the keel. All this structure is temporary. The hull is assembled over this framework and eventually lifted off. The building frame can then be disassembled ready for the next builder to use.
Here are the stringers resting in place but not screwed on. ignore the frame in the foreground - it is for another boat.
Gone to a New Home.
Sadly I have parted with my Derwent Skiff. I loved the feeling of flying over the water that came with the long oars and sliding seat but t...
-
Here is that last photo of the build process. The boat is sitting on the trailer that was built for my Acorn 15. The boat is supported by th...
-
Sadly I have parted with my Derwent Skiff. I loved the feeling of flying over the water that came with the long oars and sliding seat but t...
-
It has been a week since the last post, quite a lot of time spent int he boat shed and my shoulders ache from hand planing! There doesn'...